David St, Mosman

This project was a complete knock down and rebuild of an Architecturally designed home.

The home is constructed over 6 levels using concrete slabs, double brick walls and structural steel frames that was completed over an 18 month period.

The project included a 25m pool that formed part of the structure of the building, and needed to be integrated with the below ground level double garage. One of the many challenges was how do we get the glass floor in and protect it during construction